Repair and Strengthening
Contribution in the committee formed to assess the Structural Safety, and Repair for the Governmental Building of Transpiration and Bridges, located downtown, which was fire burned during the current protests, 2012.
Development and Expansion of the Exxon Mobil Gas Station, Located Downtown Cairo, 2012.
Repair and Strengthening of a Mosque, located at Al-Sharkia, 2012.
Repair and strengthening for the office building of the United Company for Trading and Transportation, Qalioub, 2012.
Repair and renewal for a variety of buildings in Opera City, Sheikh Zayed. Owner: Housing and Development Bank- 2011
Strengthening of the RC skeleton for Sedi Abdel Rahman hotel–AlAlamain–North Coast to give the suitable methods for such purpose due to occuring of sagging, deflections and steel reinforcement corrosion attack in the skeleton of the structure "EGOTH" comp
Strengthening for a 11-story building at Giza, resting on soil fill, Courniche El-Nile, by adding pile foundation. A paper published in the 2nd international conference for case study Missouri University Rola USA in June, 1988.
Strengthening of Indonesian Embassy Building, Mesaddak Street, Giza.
Repair of a Villa in Mansoria, Haram, as the R.C Skelton has a high percentage of Chloriad Ions, published in building deterioration in the Arab Countries Symposium in El-Riad March 1992.
Repair and Strengthening for a building of Agricultural Insurance Bank in Zagazig Sharqiya through a consultant of Engineering Professors Faculty of Eng. Zagazig University.
Repair and Strenghthening for Al-Orman school buildings at Al-Agouza, Giza.
Repair for an Olympic swimming pool at Somoha Sports Club in Alexandria, where water leak has been treated, leak resulted due to structural cracks in the retaining walls.
Repair for a swimming pool in the Military Collage at Abu Quir, Alexandria, where vertical wall cracks have been treated, cracks resulted due to changes in temperature.
Repair for Al-Helal Hospital building, Damietta, owned by Damietta committee (due to steel corrosion).
Strengthening the Building of Administration and Storage, Modern Company for construction, Al-Amerya, Alexandria, Building constructed on swelling soil.
Strengthening for the building of the new branch for Omar Effendi Company, El-Menia branch, cracks appeared on basement columns two years after construction due to steel corrosion resulted due to the presence of high chloride ions.
Strengthening of 10-story building, Al Sheikh Ali Youssef st., Al Qasr Al Einy, Cairo, by adding a new piled raft.
Repair of Laundry Building in Amoun Island Hotel, Aswan.
Repair and Strengthening of the Youth Hotel Building, Al-Sharqiya Stadium, through a group of consultant engineering from Zagazig University.
Repair of Al-Orman hotel school, Zaghlol street, Al Haram.
Strengthening of Embaba Public Hospital, Giza.
Repair of Kasr El-Nile Police Station, by Al Gomhoriya Company for construction.
Strengthening of Y. Shaheen Building, Al-Haram.
Strengthening of Residential Building, Al-Nabawy st., Al Agouza, Giza.
Strengthening of Buildings No. 10,11,12,13, and 14, Nasr City. A paper published in Arab Conference for Building Deterioration in September 1998, the buildings was on deep soil fill.
Strengthening of 12-story tilting building, Kafr Tohorams, Giza, by using Micro-piles.
Strengthening of 6-story tilting building, Imbaba, Giza, by Straus piles .